GetEYT

Updates

What has shipped, what is next, and what is not connected yet. This is the page the printed code points at, so it is the one that stays current.

4 shipped5 dated ahead7 still openread from the codebase on 10 August 2026

01

Shipped

4 entries
  1. 10 Aug 2026

    geteyt.com

    This site. It lists what exists rather than describing it, and the updates page is the part that stays current.

  2. 10 Aug 2026

    All four phases are written

    Counted in the codebase, not estimated: 105 page files across the studio console, headquarters, the member account and the public studio pages, and 35 API route groups behind them.

  3. 9 Aug 2026

    Running on its own servers

    Production and staging, both up. A restore was run against the backups on 9 August and it passed.

  4. 5 Aug 2026

    The walkthrough is open

    All five views are clickable at netryse.com/geteyt/ without a login. Names and numbers inside are examples; everything else is the real product.

02

Next

5 entries

Jessica gave the interval, three to four weeks. Everything below marked proposed is that interval applied to September 1, and it stays proposed until she confirms it.

  1. August 12

    The owners meeting

    Jessica presents the network. A short demo, and this page is where the code on screen points.

  2. September 1 proposed

    Phase 1 turns on

    Run the studio. Proposed date.

  3. Late September proposed

    Phase 2 turns on

    Fill the classes. Proposed date.

  4. Late October proposed

    Phase 3 turns on

    Teach the method. Proposed date.

  5. Late November proposed

    Phase 4 turns on

    Own the network. Proposed date.

03

Not done yet

7 open

The software is written. What is left is connecting it to outside accounts, plus three things that are somebody's decision rather than somebody's work.

Not connected

4
  • Email sendingNobody can sign in until this is connected, because the sign in link arrives by email. It is the September 1 critical path and it is a day of account setup, not a build.
  • File storageNeeded before video and trainee submissions work. Phase 2 and phase 3 wait on it.
  • Live card paymentsPayments are built and run against test mode today. Real cards are the next step.
  • Text messagingBuilt, including the consent record and the quiet hours check. Phone numbers and carrier registration are next, and nothing sends until that is done.

Waiting on a decision

3
  • The four phase datesJessica gave the interval, three to four weeks. The dates on this site are that interval applied to September 1, and they stay proposed until she confirms them.
  • What the software costsBeing worked out with the owners rather than announced to them.
  • Whether anything is shared across studiosCross studio numbers, and anything an assistant would remember from one studio to another. Nothing has been decided, so nothing is being done.

Nothing on this page is a percentage and nothing on it is an estimate. An entry moves lists on the day it moves, and the full index of what exists is on thefront page.